TO GET INVOLVED NOW CLICK HERE

User login

Draft Energy Descent Plan for review

WORK IN PROGRESS

 This page carries the draft scripted Energy Descent Action Plan.  The EDAP is being developed in sections and these are being added as a separate file as each becomes available for general comment and review. Most of these files will not carry all the pictures and illustrations at this stage as these are stiil under development and enables us to keep the files smaller for you to download.

Please see below for how to comment on the draft EDAP

The draft files for downloading are at the bottom of this page.

If you would like to view the materials from the public and TTT workshops that have informed these drafts please click here

please note REVISED DEADLINES - apply to all sections

Friday 17th July  - Closing date for first revisions to early drafts: (ie. input from TTT groups, workshop participants, EDAP mailing list)

Monday 27th July  - Release of Revised documents to wider public consultation including Localeyes Website

Friday 28th August - Public Consultation closes

It would be helpful if you could let me know your group’s schedule for discussing the relevant section of the EDAP and if you would like me to attend the meeting(s).

List of Contents:

Contents
Contents    3
Introduction    5
How to use this document    6
Part One    8
Where We Start From    8
Introducing the Wonder of the Oil Age    9
The Assumptions that Underpin this Plan    10
Is Totnes the first town to create a ‘Plan B’ like this one?    13
Resilience    16
Localisation    17
Totnes and District    21
Part Two    23
Creating a New Stories...    23
Why We Need New Stories...    24
Stories of our Recent Past    27
Setting the Scene    27
Food    27
Energy    36
Transport    39
Dartington    39
The World of Work    41
Reflections    42
How This Plan Came About    44
The Story of Transition Town Totnes    45
Part Three    47
A Vision of Totnes in 2030    47
The Objectives of this Plan in a Nutshell    48
 Resilience Indicators - characteristics of a resilient community
Contingency planning for the unexpected
Linked Pathway 2009 – 2030
Other Energy Descent & Power-down Plans
 

Part 4      Themes & Pathways for Energy Descent

Working with Nature:

  • Food Production & Farming (docs: Food draft 5 & Can Totnes Feed Itself? attached) 
  • Health & Wellbeing (doc: Health & WB draft 3 attached)
  • Supporting Biodiversity (doc: Biodiversity draft 4 attached)
  • Water matters
Creative Energy systems:
  • Renewable Energy Budget (doc: EDAP energy budget draft 3 attached) 
  • Energy Security (doc: Energy Security draft 3 attached) 
  • Transportation    (doc: Transport Plan & Transport draft 2 attached)
  • Building & Housing (doc: Building & Hse draft 4 attached)

Resourcing Localisation:

  • Economics & Livelihoods(doc: Economics draft 4 attached) nb.This document is an early draft which is currently under review by our TTT Economics & LivelihoodsGroup.  The revised document which will be posted as soon as it becomes available is likely to have substantial changes and you should be aware of this when making your your comments.  We apologise for any inconvenience this may cause
  • Consumption & Waste (doc: Con&waste draft 2 attached)
Nurturing Transition:
  • Arts, Culture, Media & Innovation(doc: Arts draft 4 attached)
  • Inner Transition (doc: Inner Transition 03.09.09) nb.This document is still under review by our TTT Heart & Soul Group.  The revised document which will be posted as soon as it becomes available. We apologise for any inconvenience this may cause
  • Education, Awareness & Skills (doc: Ed & Skills draft 4 attached)
Empowering People:
  • Local Governance
  • Community Matters (doc: Community draft 3 attached) nb. This document is an early draft which is currently under review by our TTT Heart & Soul Group.  The revised document which will be posted as soon as it becomes available is likely to have substantial changes and you should be aware of this when making your your comments.  We apologise for any inconvenience this may cause
  • Youth Issues (doc: Youth issues draft 1 attached)
Part 5 Appendices
•    Appendix A     Assumptions behind themed pathways
•    Appendix B    Baseline Information & Statistics - Totnes & District
•    Appendix C    Calculations (doc: Part 7 Appx C draft 3 attached)
•    Appendix E    Earth Charter
•    Appendix G    Groups & Contacts page
•    Appendix M    Methodology & Meetings
•    Appendix Q    Questionnaire
•    Appendix R    Review process and feedback form
•    Appendix V    2030 Visions
•    Appendix W    Wondermentalists Cabaret
Glossary of terms
Index




Notes About Adding Your Comments:

If possible please download the sections and put your comments, ideas, additions, deletions in the text using Highlight Changes (in the tools menu)
1.    Please comment on / add to / delete the content, layout etc and suggest extras, photos etc
2.    Add information about projects associated with your group to the timeline in main text as appropriate / likely to pan out.
3.    Add other relevant activities you are aware of not but not included here
4.    Add ideas / have a bit of fun with the pathways table
5.    Add any targets, events, plans or policies coming into force that you know of to the pathways
6.    Any useful references you think we could add

Please email your comments and files with suggested changes to edap.totnes@transitionnetwork.org
 
Thankyou

 

AttachmentSize
Transport plan-EDAP low res.jpg113.72 KB
Transport 2nd draft.doc312 KB
Con & waste draft 2.doc197.5 KB
Can Totnes Feed Itselfarticle Very Final Published Copy.doc1.85 MB
Arts draft 4.doc94.5 KB
Biodiversity 4th Edit.doc113 KB
Build & Hse 4th draft.doc136.5 KB
Community 3rd draft.doc106.5 KB
Food 5thdraft.doc167.5 KB
Health & WB 3rd draft.doc146.5 KB
Youth draft 1.doc95.5 KB
Education draft 4.doc110 KB
Energy budget draft3.doc696 KB
Energy Security 3rd draft.doc214 KB
Appx C calcs dft 3.doc158 KB
Inner Transition 070909.doc179.5 KB
E&L EDAP Aug 09.doc39.5 KB
Font size :
Home